Wednesday, 8 December 2010

From Snow to Surf

It feels weird to think that 5 days ago I was in the snow and wearing as many layers as possible. Now I’m wearing as few as possible! I know everyone in England reading this will think I’m being a cow and rubbing it in, but it’s quite a major theme I’m afraid! I have heat rash, as per usual, which is a pain, but I’m being good and trying not to scratch it. My face is bright red, not from sunburn, but because I’m a true brit and am also sweating like a pig, it’s running off me in rivers during the day at the moment, but I’m hoping that I will soon acclimatise and start to look a bit more human!

So, what’s been happening? A hell of a lot actually! The last few days have been surprisingly action packed, but I’ll start at the beginning….

I met S in the airport, who I sailed with on my first trip on the Patricia, and we got through all the usual airport gubbins without any fuss, although we were fairly late in checking in so didn’t get seats next to each other. Then in the baggage drop off que I saw a face I sort of recognised and he asked if we were joining the Wind Surf, it turned out he was a guy from college who had qualified in August and was joining the ship for his first contract as 3/O. On the plane I found my seat and once sitting down, the guy on my left asked if I was joining the Wind Surf. Out of all the people I could have ended up next to I was next to an ETO cadet who was also joining the ship! The flight was long and uneventful, although we were about an hour late for take off, not because of the weather I think, but because of luggage loading issues. It was very warm as I stepped off the plane, but it was cloudy so I didn’t get that smack in the face feeling of a really hot day! We were all being put up in the same hotel in Barbados for a night, so once we had dumped our bags in our rooms and freshened up we all went out for some food and a drink. It wasn’t a late one by any means though, we were all shattered, the taxis were coming to get us at 0800 the next morning and although the clocks said 2130, our bodies said 0130!

Arriving at the ship, I lugged my cases along the quay wondering why they felt so much heavier when I actually had to carry them somewhere. I thought I’d packed fairly light, albeit in two bags! On the ship we signed on the articles, handed in certificates, saw the doctor (who stuck two needles in me, one for flu, and one to see if I have TB) and then went up to the bridge to meet the Captain and officers. Nothing very exciting happened that day, it was all the usual inductions and getting uniform and wandering about the place trying to work out where we were. There is another cadet on board, A, he’s an engineering cadet so we won’t see him that much during the day. He showed me where the crew bar was that evening, and it was quite late when I hit my bunk. Speaking of my cabin, I’d better tell you a little about it, as I will probably be mentioning certain aspects of it quite often. Sizewise, it’s fine, with two wardrobes and plenty of storage space although the bathroom is a little small,(While the shower is a good size, I run serious risk of bashing my nose on the door every time I go to the loo!) I have a fore and aft bunk which has 4 tiny little steps up to it and I have a porthole too, which is wonderful. There’s only one problem really: we are right down in the bottom of the ship, right next to the steering gear and next to the propellers too. It’s not a quiet cabin!!

The ship sailed to Bequia overnight and I was up on the bridge in time for anchoring, we then tagged along to a safety meeting with the C/O and then went in search of formal uniform for the Introductions cocktail party. To be fair, the C/O actually described it to us as ritual humiliation. He and all the other senior staff and officers have to line up and get introduced by the Captain. But it’s only once a week, and there’s free drinks, so it can’t be all that bad. Life got even better after that too, as the C/O told us to go and have a swim in the afternoon. The ship has a platform aft that lowers down whenever the ship is at anchor, from there you can swim, sunbathe on the rafts, go waterskiing, kayaking or windsurfing. I couldn’t believe my luck, second day at work and I get this!
The only negative so far is that the storekeeper doesn’t have any ladies formal uniform so S and I have the mens uniform instead. I feel a bit of an idiot in it, but having it does mean we can go upstairs in the evenings. Having sailed on the QM I figured that the drinks would be limited to the cheaper stuff for us, and that we would have to be accompanied by a senior officer if drinking in the public bars at any other time. This is not so… At the cocktail party I’m allowed any drink I like for free, and as long as I’m in uniform I can go to the public bars at any time, where, as a cadet, I get $15 a week for free (higher ranks get more), and then all other drinks are 50% off!!  This ship is extremely good to it’s crew, and I am already of the opinion that I had better work damn hard and make a good impression, because I want a job here when I’m qualified!

The ship was already alongside the quay at Greneda when we got to the bridge at 0800, and the last lines were being made fast. The berth isn’t sheltered by a harbour and although there was only a small swell the wind was pushing the ship off the berth and she was surging quite a lot. As they have to use the anchor windlass for all mooring lines it is difficult to make them all even so some lines were taking more strain than others. While the sailors were still on the deck one of the lines parted, and actually hit the 2/O, grazing his elbow and scraping his arm as well as hitting him in the chest. He was incredibly lucky though, and aside from the graze he was unharmed. The C/O sent him to the doctor anyway and meanwhile photos were taken of the rope and the area for the report.
After another set of inductions we got our boiler suits on and started on a task the C/O has set us, as we walked down the bridge deck 2/O Navs called us back and gave us a master key, asking us to go down to the pool machinery room right aft on deck three as a flood alarm had gone off in there. Alarms often fault, and while you always go and check it out, you never actually expect to find something, however…. We got down there at the same time as A (Engine cadet) and opened the door to find that there was indeed a flood, with water spraying out of some part of the equipment. We called the Bridge immediately and told them that the flood was very real. A tried to find the valve to shut off the water but is unfamiliar with that machinery and couldn’t find the right bit. We went down to deck two and found that water was coming through the deckhead, as we were next to the marina (which was closed) we grabbed the dirty towel bins and used them to catch the majority of the water coming through, as well as getting towels and laying them over the wet carpet to minimise the damage as much as possible. The 2/E arrived soon after and was able to shut off the water. There wasn’t anything else we could do so we went back to the bridge to give them an update on the situation and then went back to the original task we had started on.
The ship has a loadline survey coming up so we’ve been asked to check that all vents are correctly labelled. This isn’t quite as easy as it sounds as the plans we are working from are from when the ship was built in France, and none of us can speak French to a level where technical terms can be translated. Online translators it turns out, are almost as useless!
While S was using the computer to try and translate, I heard a bang from outside. I went out and looked down from the bridge wing, and saw a line had parted. I told the bridge immediately and then went down with 2/O LSA and the new 3/O to the mooring deck. The line that had parted had been stopped off on the windlass so we removed the broken rope first and then looked for a spare line, the only one left was the extra large one (known as the Anaconda) so, with the sailors who had by then arrived, we pulled it out and led it to the windlass, it weighs a ton and took all of us. The 2/O threw a heaving line to shore, and we fed the huge rope down to the sailors on the quay. Once it was over the bollard he tried to start the windlass to heave it in, but nothing happened. Because the line was on the windlass when it snapped, it must have tripped something. He called an electrician, who was unable to fix the problem immediately, so we heaved in the slack by hand, not an easy task! We weren’t able to get it very tight at all, so once it was made off, the line on the other side of the windlass (which still worked) was stoppered off and put on the bits and we then put the large line on the windlass to heave it in. I hope we don’t get many days with problems like that, but on the other hand, it’s good to be around when the bad stuff happens as one day I may well have to deal with stuff like that on my own.

Today was much quieter, we spent the morning stencilling labels, and were going to go see an engineer this afternoon to see if he could help us identify the ones we couldn’t translate. But the C/O decided instead that we would be much more useful on the sports platform. I kid you not, our job this afternoon was to go and drive a boat around. It’s had a new engine put in and apparently needs to be driven for 50 hours before it can be used. I went down a little early so I could have a swim first, (well, who wouldn’t?) We got some practice berthing it and generally pootled about in it until the platform started getting busier and the sports guys were needed.

I can’t believe my luck really, this ship is brilliant. I may feel a bit less enthusiastic after 4 months, but I think this is going to be the best trip so far out of my cadetship. It’s bigger than the Pat and smaller than the QM2, so there’s lots of people to hang out with, but not so many that you stand no chance of getting to know everyone. She has sails, and they use them! Last night was wonderful as the engines were turned off and we sailed to Mayrau, meaning I got a lovely quiet night’s sleep :)

Friday, 3 December 2010

I sit here with a glass of rum....

I'm sorry, this is another update that is mostly out of date, but it's the last one, I promise, and there is some new news too....

We were due to be going back to college in January of this year, but as our group is so small, the college decided to amalgamate us with the FD group that had started in May '09 and bring us back in February. I found out about this in mid December and, as much as I love my parents dearly, the thought of sitting around on my backside at home for that long didn't appeal. I was struggling with the Work Based Learning (the project work we have to do for college while we're at sea) so I asked if I could be put back onto the Patricia for a few weeks. My company were very obliging and I joined the ship on the 30th December. I did 6 weeks this time and I am unbelievably grateful for that time, as I was able to get all my loose ends tied up and produce a body of work that made my tutors faces fall as I plonked the huge folder on their desks! This was mainly due to the fact that, on several occasions, when I went to see the Chief Officer in the morning to find out what I'd be doing that day, they asked if I had any project work to be doing, and told me go and crack on with that. This then is the abridged version of the log I kept over those weeks, with as much of the fun stuff as I can remember thrown in. Days that are missing I was either doing work in my cabin. Or greasing. There was a lot of greasing.....

30th Dec 2009
Falmouth
I joined the ship in the afternoon, having once again stayed with my friend who lives down there, and once again feeling slightly jaded from the night before. This time I was not sent below to the cabin I had been in before, but was sent up to the lower bridge deck, where the Captain and Chief Engineer also reside! This was not because I had been promoted though, it was far more practical; the berths below were needed for the maintenance crews who we would soon be taking out to various lighthouses and I was simply being put somewhere out of the way, for the moment anyway. I wasn't complaining though, I had lots of space, a lovely big desk, two windows, (one on each side, which gives the cabin it's nickname "The fishbowl") and oh joy of joys, a bath! I never actually had a bath, but knowing that one has that option is always comforting.

31st Dec
Falmouth
The ship didn't sail that day, so I had the day to re-familiarise myself with the ships layout, and then in the evening I went out to celebrate New Years with some of the crew. As I'd sailed with them before I didn't feel like the 'new girl' and we saw the new year in with the help of quite a lot of drink!

1st Jan 2010
Falmouth - Bridport
We had a lifeboat muster in the morning and then sailed for Eddystone Lighthouse to drop off some maintenance workers before heading to Bridport to anchor overnight.

4th Jan
Penzance.
Am. I  learnt how to drive the stores crane, moving gear around the heli-deck in preparation for heli-ops tomorrow. I knew where to move the crane by following hand signals given by one of the ABs who was watching the heli-deck below. It's fairly easy, once you have worked out which direction to move the levers on the control unit - it wasn't as obvious as it sounds!
The work boat was lowered to go ashore but when it came to hoisting it to take off the tricing pendants it was found that there was no power to the winch. The engineers found that several things were without power due to the main breaker malfunctioning, and set to to repair it. Meanwhile we lowered the searider on the stores crane to get people ashore.
Pm. Finished the stores crane checks with Boatswains mate then went to the Heli-deck to help with the last bits of preparation. The engineers had managed to fix the problem with the power, but when we’d lowered the port boat it wouldn’t engage it’s gears, so we lifted it back up and put the starboard one down instead. I was on the davit brake, which controls the lowering of the boat. I found it quite difficult to lower it slowly as you have to lift the brake enough to get going, but once it’s going it goes quite fast, so you have to slow it down by lowering the brake again, this meant the guys in the boat had a bit of a jerky ride unfortunately. Second go I started to get the hang of it, but I still need a lot more practice.

6th Jan
St Peter Port.
Anchor aweigh at 1120, standing by.
The ship was due to meet the helicopter in order to receive back the remaining water bags sent to the lighthouses, but due to the weather we were unable to do so. (Helicopters cannot fly in snow as it restricts the visibility). The crew were on standby for heli-ops and were called up and stood down several times before it was finally decided to call it a day.

9th Jan
Looe – Whitsand Bay - Penzance
Am. The searider was lowered to go ashore for newspapers and I went too, climbing down the buoy jumping ladder to get in, which felt pretty hairy as I had to make a bit of a drop to actually get in the boat. It was nice to get a little leg stretch ashore, and Looe harbour is quite pretty. The icicles on the cliffs we passed on the way in would make me think twice about getting out on the water in a row boat, but the local gig team were out. (All gig rowers I have ever met are mad...) I drove the searider back to the ship, and took it alongside to let one man out before we raised it.  I then attempted to get the boat into position for lifting on the stores crane but struggled with the choppy water and stiff wheel, more practice required!

17th Jan
English and Welsh Grounds
Am. I spent the morning in the engine room as they had opened up the port fuel service tank for survey, it had been ventilating for three days and was ready to be inspected. It was smaller than I had thought it would be, and the hatch access was so tiny they had to do a sort of limbo to get out!

20th Jan
In port, Swansea
Crew change day.
Am. Bomb search drill:  it's not nearly so exciting as it sounds, the C/O hides a couple of blocks of wood with the word BOMB on them and everyone hunts round a given area, I found one in an electrical locker. I think if it was a real one we would have maybe done a little more than pick it up and take it to the bridge, but I don't think bomb deactivation is on the OOW syllabus so I'm not going to worry about it! We also did a paint store fire drill, which I 'discovered'. It was very straightforward: use the talkback system to talk to the bridge and then pretend to put it out with the conveniently placed CO2 extinguisher! It sounds silly really, but if you catch a small fire it's better to just get on and put it out, rather than waiting for a full fire team to kit up, in which time a small fire might well have got a lot bigger.
Pm. I helped load the new food stores, filling the cage on the quay, and then went and helped on the fore deck stowing the new chains. The chains come in big bundles which have to be untangled (they're not meant to be tangled but, sh*t happens!). This is done using the crane to lift them up, and then flake them out. The crane driver can't do it all though and crew are required to heft sections about using long hooks.

23rd Jan
Barry – Swansea Bay
Am. The workboat was put down to inspect a buoy that had been reported as a casualty, which brings wonderful images to my mind of a buoy needing bandages and a drip, but in fact it was just that the light wasn't working. The crew then lifted and replaced two buoys, I was on deck for this and helped where I could, which admittedly, isn't much, but I was allowed to drive the capstans a few times, and there's always the crud that gets washed off the buoy to sweep up!

25th Jan
Milford Haven – Skokholm – The Smalls – Milford Haven
Am. I spent the morning on the bridge helping the 2nd mate and doing a compass error (one small part of the process in celestial navigation), the ship steamed to Skokholm to transfer supplies and personnel to the lighthouse by helicopter and then moved on to The Smalls.
Pm. The heli-ops continued at The Smalls and I had the opportunity to go for a ride in the helicopter over to the lighthouse.This involved putting on a full flight suit, (slightly too big but close enough) and watching the videos, (again) and then, clutching my camera, I was strapped into the back seat, excited as a five year old. It didn't feel nearly as weird as I thought it would, there was no sudden stomach lurch or anything, just an elegant glide. At the lighthouse I got out to get a couple of shots, it's a very small platform, and I didn't feel like taking a stroll to the edge (not that I'd have been allowed to). The lighthouse is literally perched on top of some rocks that the sea constantly washes over, no island or anything, quite how they built it I'd love to know!
At around 1600 the helicopter had just landed on for re-fueling when a warning light came on in the cockpit, there was a problem with the engine and they couldn't fly any more. The ship returned to Milford Haven and anchored for the night, ready to steam to Swansea at 0630 am. The problem wasn't as major as it sounds and the pilots reckoned they could have kept flying, and they would have had they not landed, but once on the ground they can't take off again with a warning light on. Dems de rules.

26th Jan
Milford Haven – Swansea
Am. Did the arrival stability with the Chief Officer. The ship arrived in Swansea at about 1215 and I went forward for mooring stations.
Pm. I watched the helicopter being lifted off by crane.This involved taking off the propellers first and then lifting it onto a flatbed lorry, very, very carefully! I did the departure stability for the Chief Officer and went down to confirm the draughts just before we sailed at 1545, I then went forward for mooring stations.
Anchored overnight in Barafundle Bay (Stackpole Head)

28th Jan
Standing off Bardsea Island and St Tudwells Islands
I spent the day on the heli-deck as an extra member of the fire team, there's a lot of stand up sit down involved in as the helicopter makes lots of short trips. The team have to be ready with hoses each time it comes in and out, but while it's off flying and at the lighthouse there's time to take off the massive Darth Vader helmets and sit down.

31st Jan
Walney Wind Farm – Lancaster Sound
Am. On deck helping with the buoy work, we laid four new Cardinal buoys around Walney Island Wind Farm. The ship then steamed to Lancaster Sound
Pm. This watch do all their maintenance jobs (greasing) as a team so everyone got on with their bit, getting the whole lot done in a day, whereas on the previous watch it had been just me and the Boatswains Mate, which took much longer! I was given the job of exchanging all the fresh water in the lifeboats. Some had developed algae in them so I left them to soak in a with a chlorine tablet in them. At anchor we had a boat muster drill and then a stowaway drill. This was basically a game of hide and seek, something I was very good at as a child! While counting life jackets a few days earlier I had noticed that the small locker on the port aft side was only half full, leaving just enough space for a me sized person. So after the muster drill, I hung about, waiting 'til the coast was clear and then hopped in. It wasn't as comfortable as I had hoped but I wasn't expecting to be in there for long.... I waited. People came past. I waited some more. More people past me. By now I was bored and wondering what was for lunch. I heard voices again, and this time the lid was opened. The guy who found me was rather surprised to find me there though, he'd noticed that the catch wasn't fastened on the locker and had, apparently, been about to just snap it closed without checking inside, assuming of course that the locker was full of life jackets! I was very glad he did check though, although had that happened I would have phoned the bridge (I'd taken my phone, just in case!)
2nd Feb
At Anchor, Llandudno (weatherbound)
Am. Rinsed out and refilled the lifeboat water bottles that had been chlorine soaked. It's not a dry job, by any means!
Pm. The Chief Officer asked me to write the scenario for the fire drill and then take charge of the incident party under his supervision. The brief was a deep fat fryer fire in the galley..

We began the drill with the Junior Catering Rating raising the alarm using the manual call point in the aft alleyway (using the test key), this set off the Yodalarm. He then closed the shutters to the mess, closed the doors from outside and isolated the electrics using the emergency buttons outside the galley. He then telephoned the bridge to inform them of the situation and the actions he had taken. Meanwhile the fire teams were mustering and the incident party arrived at the scene, we established comms with the bridge via radio and requested the fire fighting team and first aid team to muster in the alleyway.
The no 1 BA team arrived and I briefed them on the situation, suggesting the use of the fire blanket on the fryer and the AFFF extinguisher on any overspill. They went on air and entered the space, the fire was extinguished and they were able to evacuate the casualty, using the EEBA to provide him with immediate oxygen. I informed the bridge when they entered the space and when they came out.
On the stretcher the casualty was given first aid for burns, copious amounts of cold water was put over his burns and they were then wrapped in cling film. The Chief Steward administered  pain relief and asked me to get the bridge to call for a Medivac, ask for radio advice and for permission to administer morphine. I relayed this to the bridge and the medical team prepared to stretcher the casualty to the heli-deck.

In the debrief I ran through the scenario and what had happened. Everyone had mustered quickly and correctly and no issues were raised. No boundary cooling had been required because the fire was contained in the fryer and had been extinguished quickly.

8th Feb
St Brides Bay – Swansea
Am. Study while the ship steamed to Swansea.
Pm. Went aft for mooring stations, controlling mooring lines on the towing winch drum and then making them off on the bits once they had been stoppered.
I then went to the foredeck and helped get the new buoy stores on deck. I was also allowed to drive the speed crane (that's the really big one!) under the Boatswain’s Mate’s supervision. I slung a chain which involves laying it out in fleets on the deck over a loop in the end, the end is then passed over the laid out chain, passed through the loop and pulled tight so the chain can be picked up and moved in one bundle.

Pics from this trip can be seen here

So, that's the end of my first sea phase, I'm sorry it's taken quite so long to get up to date, but, as you may have gathered from earlier entries made over the last 9 months, college has been keeping me busy! Anyway, there's not much I can blog about while at college, not much happens in Fleetwood and I have no desire to bore you silly with details of lectures, and I can never remember enough of the nights out to make a good story! But it's over now, and I'm feeling a little bit smug (OK, very smug but I'm trying not to!) ..... I came top of my class, with an overall mark so far of 95%. It's not over yet though, I have some more of the old WBL to do, and this time it counts for something like 40% of the overall mark, so no pressure then!

I am off in the morning, catching the National Express to Gatwick (damn snow's buggered up the trains) and from there I fly to sunny Bridgetown, Barbados to join the Wind Surf, a cruise ship with sails. (I realise you all hate me now). And, now that I am up to date, I intend to keep up to date, although as we all know, the road to hell is paved with such good intentions... Anyway, if you enjoy this, would you let me know? I sometimes feel a little lonely on here, with post after post bereft of comments... I am also on twitter, @size4riggers should you wish to hear random snippets of ships life and/or my general musings, and I have been proudly cultivating my flickr photos, (I was 2 years behind a few months ago, there has been some serious work going on!). They go back through the whole of my first Caribbean experience on the TS Pelican, and I will be interested to see if some of the places I visited then have changed. It's all neatly organised, if you have a peek at the collections and sets...

I'll stop the shameless self promotion now, and go get another glass of rum. I would have cider, but I'm at my sister's, and one has to make do!

Tuesday, 23 November 2010

A daily diary - 1st Trip THV Patricia

Apologies in advance for what is probably a rather more dull blog post than you have become accustomed to from me, but on the other hand, life on ship isn't always that fun and interesting and there are often long periods when life is fairly dull and monotonous. Plus, there's really no way of making brass polishing sound interesting!! This blog is my way of catching up quickly on past events, as I only have about a week and a half before I am off to sea again, which I will be telling more about soon!

To make it more interesting you might wish to read it while also looking at the photos from this trip, which tell the story just as well really. Click here to go to the photo set!

2nd July 2009
In port, Liverpool
Am. Final polishing of the cannons on the boat deck aft.
Pm. Leave ashore. VC (Visiting Committee) joined the ship in the afternoon and held a big dinner party, which went on a bit later than expected, so it was 2330 before the guests had gone ashore and we let go lines.
Vessel steamed overnight to Workington.

3rd July
Workington – Moelfre, Red Wharfe Bay
Am. On the bridge, I read and signed the Masters standing orders, and got on with finding out the ships particulars and details for record book.
Pm. We were shown around the engine room by the Chief Engineer and gathered more information for our workbooks.
When the ship arrived at the next buoy (a class 1) I went out in the work boat to watch one of the AB's and the second mate replace a racon beacon.
Anchored overnight.

4th July
Molefre – Pwllheli, Tremadog Bay (North Cardigan Bay)
Am. Polishing brass.
Pm. Study.
Anchored overnight.

5th July
Pwllheli – Bardsey Island - Pwllheli
Am. Study.
Pm. 1200 -1600 watch on bridge
Vessel steamed overnight to Caldey Island.

6th July
Caldey Island - Swansea
Am. 0800- 1200 watch, I spent a good hour and a half holding the ship in position standing off Caldey Island using the bow thruster and props
Pm. Study.

7th July
In port, Swansea.
Day off.

8th July
In port, Swansea.
Am. Polished one of the cannons on the boat deck again, they now need to be shined up before being oiled and wrapped which will, hopefully, prevent them from being in such a state next time they’re brought out.
Fire Drill at 1130, my station is on the bridge.
Pm. We exercised the Starboard lifeboat as part of the vessels planned maintenance routine. Both S and I had a turn at steering her. The lagging on the exhaust had worn through and it started to smoulder as we returned to the ship. The Engineers inspected it immediately and replaced the lagging.
The Chief Mate showed me how to fill out the stability spreadsheet from the daily tank readings and we then checked the resultant trim against the actual draft marks on the ships side.
Vessel steamed to anchorage near SWIGG (South West Inner Green Grounds) lightbuoy, Swansea Bay. Anchored overnight.

9th July
SWIGG  L/b – Caldey Island
Am. On deck observing buoy work.
Pm. On the bridge, 1300 -1700
Anchored overnight.
10th July
At anchor off Caldey Island
Am. Run ashore to Caldey Island.
Pm. Brass cleaning, I got the Elder Brethren’s compass binnacle, bell, vessel’s God Mother’s plaque and clock clean and put away below. Then we were re-shining the taff rail tips before oiling and wrapping them.
Anchored overnight.

11th July
Caldey Island – Lundy Island
Am. 0800- 1200 Watch. The weather is predicted to worsen in the afternoon so after servicing two buoys the ship steamed to Lundy Island for shelter.
Pm. Study.
Anchored overnight.

12th July
Lundy – Minehead
Am. Attended security and health and safety briefings.
Pm. Finished polishing, oiling and wrapping the taff rail tips on the heli-deck.
Anchored overnight.

13th July
Minehead – Coombe Martin Bay
Am. Went out on the motor boat with 2nd mate to check firing range buoys off Minehead and then I was on deck for the last lift and service of the trip.
Pm.1200-1600 watch.
Anchored overnight.

14th July
 Coombe Martin Bay - Swansea
Am. 0800-1200 watch, helmed for an hour, and then helmed under pilotage for an hour as well, bringing the ship up the Swansea channel and into the docks.
Pm. On the bridge for harbour watch. Bunkering commenced at 1456.

15th July
In port, Swansea
Crew change day.

16th July
Swansea – English & Welsh Grounds, Bristol Channel
Am. Went through the steering gear checks on the bridge with the 2nd Officer  and went below to observe the emergency steering gear checks. Went aft for letting go.
Pm. 1200-1600 watch, position plotting and got an hour and 15mins steering. Watched the Breaksea class 1 buoy being replaced.
Anchored overnight.

17th July
E&W Grounds – Barry Roads
Am. Checking all the immersion suits and life jackets on board.
Pm. Started on checking the supplies in the lifeboats.
Anchored overnight.

18th July
Barry Roads – Lundy Island
Am. Watched safety videos on heli-ops then continued checking the contents of the lifeboats. After smoko I was told to get up to the bridge to get some more steering in, and also after lunch.
Pm. Swapped with S and carried on where she’d left off with the life boats. Only thing left to do was change the fresh water in the canteens. The ones for the work boats were fine but the ones in the open lifeboats had gone rather green from sitting in such a warm place under the covers.
Anchored overnight.

19th July
Lundy Island – Milford Haven
Am. Run ashore in the morning to see Lundy.
Pm. Steamed to Milford Haven, I helmed for a couple of hours on the way and then took the helm to take her in.
Anchored overnight.

20th July
Milford Haven – Skokholm – Bishops Rock – St Brides Bay
I helmed us out of Milford Haven. The ship then met a helicopter off Skokholm to supply the lighthouse with water, and then moved on to South Bishop to supply the lighthouse with oil, water and building materials for the roof renovation.
Anchored overnight.

21st July
St Brides Bay - Swansea
Am. Steaming to Swansea, I helmed for an hour, the weather was rough and vis poor.
Pm. Spent the afternoon photographing any parts of the ship I hadn’t already taken pictures of.

22nd July
In port, Swansea.
Signed off.